Select your language

We Help Operations Managers to Conceive and Actualize Their Industrial Visions Based on the Lean Manufacturing Culture

We Help Operations Managers to Conceive and Actualize Their Industrial Visions Based on the Lean Manufacturing Culture

Learn to identify the activities without added value on the gemba

intra

Objectives

  • Quickly train all the actors of the Gemba to identify and eliminate the wastes
  • Learn to identify the activities which do not have added value on the gemba
  • Understand why it is necessary to eliminate waste non-stop
  • Discover the means available to the operators to eliminate these wastes
  • Increase the quality and the number of improvement proposals
  • Facilitate understanding, on behalf of the operators, the workshops and the activities that are carried out on their gemba

Participants

Operators of the gemba

Date & Duration

Date :

According to availability

Duration :

2-Hour training: Possibility of 3 sessions per day

Brief and interactive training, with sample situation.
Up to 36 operators trained per day.

Locations & Fees

Locations :

At your locations

fee :

€2200 excluding VAT

Enrollment

DIF

Detailed training program

  • Why improvement is required in stability
  • What is value added activity – non value added activity
  • The 7 Muda or wastes
  • The hunt for waste: exercise on the field for small groups
  • Restitution of the hunt for waste
  • Examples of simple, proposed and achieved improvements by the workers
  • The means of improvement

2-hour session, per team of a maximum of 12 people.

Realization of 3 sessions per day, 36 people trained.

Being present on the field is mandatory.

sensibilisation-gaspillages
sensibilisation-gaspillages-2